
L3Campus Stackable Managed Switch
Manylebau
- Model: Omada Campus Stackable L3 Managed Switch
- Front Panel: Mode Selection Button, Management Port, LED,
Console Port USB2.0 Port (Type-C/RJ45), 1G RJ45 Port, 10G SFP+ Slot
LED - Arwydd LED:
- PWR1*: Green On (switch powered by PWR1), Off (PWR2
disconnected or not working properly) - PWR2: Green On (switch powered by PWR1 and PWR2 connected),
Yellow On** (PWR2 powered), Off (PWR1 disconnected or not working
yn iawn) - LED SYS FAN: Green On (all fans work properly), Yellow On (not
all fans work properly) - MGMT: On (device linked to port), Flashing (transmitting or
receiving data), Off (no device linked to port) - MST: On (device linked to port), Flashing (transmitting or
receiving data), Off (no device linked to port)
- PWR1*: Green On (switch powered by PWR1), Off (PWR2
Cyfarwyddiadau Defnydd Cynnyrch
Pennod 2: Gosod
Cyn dechrau ar y broses osod, gwnewch yn siŵr bod gennych chi'r cyfan
the necessary tools and follow safety precautions.
- Cynnwys y Pecyn: Check all items mentioned in
y pecyn. - Rhagofalon Diogelwch: Follow the guidelines to
sicrhau gosodiad diogel. - Offer Gosod: Gather all tools required
ar gyfer gosod. - Gosod Cynnyrch: Dilynwch y cam wrth gam
instructions provided in the manual for successful
gosod.
Pennod 3: Cysylltiad
After installation, connect the switch to the network using
appropriate cables and ports as per your network setup.
Pennod 4: Ffurfweddu
Configure the switch based on your requirements. You can choose
between Standalone Mode or Controller Mode as per your network
anghenion.
FAQ
Q: What should I do if the LED indications show an error?
A: If the LED indications suggest improper functioning, check
the power sources and connections. Refer to the troubleshooting
adran yn y llawlyfr am ragor o gymorth.
Datrysiad Rhwydweithio Busnes
Canllaw Gosod
Omada Campus Stackable L3 Managed Switch
Ynglŷn â'r Canllaw Gosod hwn
Mae'r Canllaw Gosod hwn yn disgrifio nodweddion y caledwedd, y dulliau gosod a'r pwyntiau y dylid rhoi sylw iddynt yn ystod y gosodiad. Mae'r Canllaw Gosod hwn wedi'i strwythuro fel a ganlyn: Pennod 1 Cyflwyniad Mae'r bennod hon yn disgrifio cydrannau allanol y switsh. Pennod 2 Gosod Mae'r bennod hon yn dangos sut i osod y switsh. Pennod 3 Cysylltu Mae'r bennod hon yn dangos sut i wneud y cysylltiad ffisegol â'r switsh. Pennod 4 Ffurfweddu Mae'r bennod hon yn dangos sut i ffurfweddu'r switsh. Atodiad A Datrys Problemau Atodiad B Manylebau
Cynulleidfa
Mae'r Canllaw Gosod hwn ar gyfer:
Peiriannydd Rhwydwaith
Gweinyddwr Rhwydwaith
Confensiynau
· Efallai na fydd rhai modelau a ddangosir yn y canllaw hwn ar gael yn eich gwlad neu ranbarth. Am wybodaeth am werthiannau lleol, ewch i https://www.omadanetworks.com/.
· Mae'r ffigurau ym Mhennod 2, Pennod 3, a Phennod 4 at ddibenion arddangos yn unig. Efallai y bydd eich switsh yn edrych yn wahanol i'r hyn a ddangosir.
· Mae cyfrifiadau cyllideb PoE yn seiliedig ar brofion labordy. Nid yw'r gyllideb pŵer PoE wirioneddol wedi'i gwarantu a bydd yn amrywio o ganlyniad i gyfyngiadau cleientiaid a ffactorau amgylcheddol.
· Mae'r canllaw hwn yn defnyddio'r fformatau penodol i amlygu negeseuon arbennig. Mae'r tabl canlynol yn rhestru'r eiconau hysbysiad a ddefnyddir trwy gydol y canllaw hwn.
Atgoffwch i fod yn ofalus. Mae rhybudd yn nodi potensial a allai arwain at ddifrod i ddyfais.
Atgoffwch i gymryd sylw. Mae'r nodyn yn cynnwys y wybodaeth ddefnyddiol ar gyfer defnydd gwell o'r cynnyrch.
Dogfen Gysylltiedig
Darperir Canllaw Defnyddiwr a Chanllaw Cyfeirio CLI y cynnyrch ar Download Center. I gael y wybodaeth ddiweddaraf am y cynnyrch, ymwelwch â'r swyddog websafle: https://support.omadanetworks.com/document/.
Cynnwys
Pennod 1 Cyflwyniad ———————- 01
1.1 Cynnyrch drosoddview …………………………………………………..01 1.2 Ymddangosiad………………………………………………………………..01
Pennod 2 Gosod ———————- 12
2.1 Cynnwys y Pecyn ………………………………………………….12 2.2 Rhagofalon Diogelwch …………………………………………………12 2.3 Offer Gosod……………………………………………………..14 2.4 Gosod y Cynnyrch ………………………………………………..14
Pennod 3 Cysylltiad ———————- 22
3.1 Ethernet Port …………………………………………………………..22 3.2 10G SFP+/25G SFP28/100G QSFP28 Slot ………..22 3.3 Console Port ……………………………………………………………22 3.4 Verify Installation…………………………………………………….23 3.5 Power On ………………………………………………………………….24 3.6 Initialization………………………………………………………………24 3.7 Stack Topology ……………………………………………………….24
Pennod 4 Ffurfweddiad ——————– 27
4.1 Ffurfweddiad Drosview……………………………………………27 4.2 Modd Annibynnol……………………………………………………27 4.3 Modd Rheolydd……………………………………………………28
Atodiad A Datrys Problemau —————- 32
Atodiad B Manylebau —————— 33
Omada Campus Stackable L3 Managed Switch
Pennod 1 Rhagymadrodd
1.1 Cynnyrch drosoddview
Wedi'i gynllunio ar gyfer menter a champus, Omada Campus Stackable L3 Managed Switch provides wire-speed performance and abundant L2 and L3 management features. It provides a variety of service features and multiple powerful functions with high security. The EIA-standardized framework and smart configuration capacity can provide flexible solutions for a variable scale of networks. Static Routing, RIP, OSPF, BGP, IS-IS, PIM-SM/DM/SSM, and ECMP come with abundant Layer 3 routing protocols that support a scalable network. Physically stacking for builtin redundancy and performance. Redundant power supplies and fans make it an ideal choice for reliable networking architecture. VRRP allows a group of switches to dynamically back up each other. ERPS supports rapid protection and recovery in a ring topology. MACsec, secure boot, ACL, 802.1x and Dynamic ARP Inspection provide robust security strategies. QoS and IGMP snooping/filtering optimize voice and video application. Link aggregation (LACP) increases aggregated bandwidth, optimizing the transport of business critical data. SNMP, RMON, WEB, Netconf and CLI Log-in bring abundant management policies. These switches integrate multiple functions with excellent performance, and is friendly to manage, which can fully meet the need of the users demanding higher networking performance. S6500-24GP4XF/S6500-48GP6XF/S6500-24MPP4Y/S6500-48MPP6Y is also a Power Sourcing Equipment (PSE*). The RJ45 ports that support Power over Ethernet (PoE*) function can automatically detect and supply power to those powered devices (PDs*) complying with IEEE 802.3af, IEEE 802.3at, and IEEE 802.3bt (only for S6500-24MPP4Y/S6500-48MPP6Y). *PSE: a device (switch or hub for instance) that provides power through an Ethernet cable. *PoE: This technology describes a system to transmit electrical power, along with data, to remote devices over standard twisted-pair cable in an Ethernet. *PD: a device powered by a PSE and thus consumes energy. Exampmae llai yn cynnwys pweru camerâu rhwydwaith, pwyntiau mynediad LAN diwifr, ffonau IP, canolbwyntiau rhwydwaith, cyfrifiaduron wedi'u mewnosod ac ati.
1.2 Ymddangosiad
Front Panel (The figure is for demonstration only. It may differ from your actual product. )
The front panel of S6500-24G4XF is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED
Console Port USB2.0 Port (Type-C/RJ45)
1G RJ45 Porthladd
10G SFP+ Slot LED
The front panel of S6500-48G6XF is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED
Console Port USB2.0 Port (Type-C/RJ45)
1G RJ45 Porthladd
10G SFP+ Slot LED
Cyflwyniad 01
Omada Campus Stackable L3 Managed Switch
Dangosiad LED
PWR1*
PWR2
Gwyrdd Ymlaen
I ffwrdd
Gwyrdd Ymlaen
Melyn Ymlaen**
I ffwrdd
Gwyrdd Ymlaen
I ffwrdd
I ffwrdd
Dynodiad
Mae'r switsh yn cael ei bweru gan PWR1. Mae PWR2 wedi'i ddatgysylltu neu mae'n gweithio'n amhriodol.
Mae'r switsh yn cael ei bweru gan PWR1. Mae PWR1 a PWR2 wedi'u cysylltu.*
Mae'r switsh yn cael ei bweru gan PWR2. Mae PWR1 wedi'i ddatgysylltu neu mae'n gweithio'n amhriodol.
Mae'r switsh wedi'i bweru i ffwrdd neu mae PWR1 a PWR2 yn gweithio'n amhriodol.
LED SYS FAN
MGMT
MST
Port 1-24 of S6500-24G4XF/ Port 1-48 of S6500-48G6XF
(When the SPEED LED is on)
Port 1-24 of S6500-24G4XF/ Port 1-48 of S6500-48G6XF
(Pan fydd y STK LED ymlaen)
Port 25-28 of S6500-24G4XF/ Port 49-54 of S6500-48G6XF ***
Dynodiad
Fflachio: Mae'r switsh yn gweithio'n iawn. Ymlaen neu i ffwrdd: Mae'r switsh yn gweithio'n amhriodol.
Gwyrdd Ymlaen: Mae'r holl gefnogwyr yn gweithio'n iawn. Melyn Ymlaen: Nid yw'r holl gefnogwyr yn gweithio'n iawn.
Ymlaen: Mae dyfais wedi'i chysylltu â'r porthladd. Yn fflachio: Yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd.
Ymlaen: Mae'r ddyfais yn gweithredu fel y switsh meistr yn nhopoleg y pentwr neu mae'n gweithio'n unigol. I ffwrdd: Mae'r ddyfais yn gweithredu fel y switsh aelod yn nhopoleg y pentwr.
Gwyrdd Ymlaen: Yn rhedeg ar 1000 Mbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 1000 Mbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 10Mbps/100 Mbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 10Mbps/100 Mbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
Ar: Mae rhif y porthladd yn nodi ID yr uned yn nhopoleg y pentwr.
Gwyrdd Ymlaen: Rhedeg ar 10 Gbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 10 Gbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 1 Gbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
*PWR1 is the primary power supply and it takes priority over PWR2. When the device is powered by PWR1, PWR2 will be working in the backup mode.
**Pan fydd PWR1 a PWR2 yn gweithio'n iawn a bod y switsh yn cael ei bweru gan PWR1, mae'n cymryd 10-20 eiliad i'r LED PWR2 (melyn) fynd allan ar ôl i PWR2 gael ei ddad-blygio.
***All 10 Gbps SFP+ slots can be used as uplink ports or stacking ports. When used as stacking ports, the slots need to run at the highest speed.
02 Rhagymadrodd
Omada Campus Stackable L3 Managed Switch The front panel of S6500-24GP4XF is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
1G RJ45 Porthladd
10G SFP+ Slot LED
Dangosir panel blaen S6500-48GP6XF fel y ffigur canlynol.
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
1G RJ45 Porthladd
10G SFP+ Slot LED
The front panel of S6500-24M4Y is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
2.5G RJ45 Porthladd
25G SFP28 Slot LED
The front panel of S6500-24MPP4Y is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
2.5G RJ45 Porthladd
25G SFP28 Slot LED
Cyflwyniad 03
Omada Campus Stackable L3 Managed Switch The front panel of S6500-48M6Y is shown as the following figure.
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
2.5G RJ45 Porthladd
The front panel of S6500-48MPP6Y is shown as the following figure.
25G SFP28 Slot LED
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB2.0 Port (Type-C/RJ45)
2.5G RJ45 Porthladd
25G SFP28 Slot LED
LED Indication LED
PWR1* PWR2
SYS FAN PoE MAX
(For S6500-24GP4XF, S6500-48GP6XF, S6500-24MPP4Y, S6500-48MPP6Y)
MGMT
MST
Dynodiad
Green On: The power supply works properly. Green Flashing: The power supply module is not plugged in properly or not compatible with the switch. Yellow On: The power supply works properly but the switch is powered by the other power supply.** Yellow Flashing: The power supply module is plugged in properly but there’s is no AC power input; abnormal power supply. Off: No power supply module is inserted.
Fflachio: Mae'r switsh yn gweithio'n iawn. Ymlaen neu i ffwrdd: Mae'r switsh yn gweithio'n amhriodol.
Gwyrdd Ymlaen: Mae'r holl gefnogwyr yn gweithio'n iawn. Melyn Ymlaen: Nid yw'r holl gefnogwyr yn gweithio'n iawn.
Ymlaen: Y pŵer PoE sy'n weddill yw 7 W. Fflachio: Mae'r pŵer PoE sy'n weddill yn cadw 7 W ar ôl i'r LED hwn fod ymlaen am 2 funud. I ffwrdd: Y pŵer PoE sy'n weddill yw > 7 W.
Ymlaen: Mae dyfais wedi'i chysylltu â'r porthladd. Yn fflachio: Yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd.
Ymlaen: Mae'r ddyfais yn gweithredu fel y switsh meistr yn nhopoleg y pentwr neu mae'n gweithio'n unigol. I ffwrdd: Mae'r ddyfais yn gweithredu fel y switsh aelod yn nhopoleg y pentwr.
04 Rhagymadrodd
Omada Campus Stackable L3 Managed Switch
LED
Dynodiad
Port 1-24 of S6500-24GP4XF/
Port 1-48 of S6500-48GP6XF
(When the SPEED LED is on)
Gwyrdd Ymlaen: Yn rhedeg ar 1000 Mbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 1000 Mbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 10Mbps/100 Mbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 10Mbps/100 Mbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
Port 1-24 of S6500-24M4Y & S6500-24MPP4Y/
Port 1-48 of S6500-48M6Y & S6500-48MPP6Y
(When the SPEED LED is on)
Green On: Running at 2.5 Gbps, but no activity. Green Flashing: Running at 2.5 Gbps and transmitting or receiving data. Yellow On: Running at 10 Mbps/100 Mbps/1000 Mbps, but no activity. Yellow Flashing: Running at 10 Mbps/100 Mbps/1000 Mbps and transmitting or receiving data. Off: No device is linked to the corresponding port.
Port 1-24 of S6500-24GP4XF, S6500-24M4Y &
S6500-24MPP4Y/
Port 1-48 of S6500-48GP6XF, S6500-48M6Y &
S6500-48MPP6Y
(Pan fydd y STK LED ymlaen)
Ar: Mae rhif y porthladd yn nodi ID yr uned yn nhopoleg y pentwr.
Port 1-24 of S6500-24GP4XF & S6500-24MPP4Y/
Port 1-48 of S6500-48GP6XF & S6500-48MPP6Y
(Pan fydd y PoE LED ymlaen)
Green On: The port is supplying power normally. Green Flashing: The supply power exceeds the correponding port’s maximum power. Yellow On: Overload or short circuit is detected. Off: Not providing PoE power on the port
Port 25-28 of S6500-24GP4XF/ Port 49-54 of S6500-48GP6XF ***
Gwyrdd Ymlaen: Rhedeg ar 10 Gbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 10 Gbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 1 Gbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
Port 25-28 of S6500-24M4Y & S6500-24MPP4Y/
Port 49-54 of S6500-48M6Y & S6500-48MPP6Y***
Gwyrdd Ymlaen: Yn rhedeg ar 25 Gbps, ond dim gweithgaredd. Gwyrdd yn fflachio: Yn rhedeg ar 25 Gbps ac yn trosglwyddo neu'n derbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps/10 Gbps, ond dim gweithgaredd. Melyn yn fflachio: Yn rhedeg ar 1 Gbps/10 Gbps ac yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd cyfatebol.
*By default, S6500-24GP4XF is shipped with a PSM500-AC power supply module, S6500-24M4Y/S650048M6Y is shipped with a PSM550-AC power supply module, and S6500-48GP6XF/S6500-24MPP4Y/ S6500-48MPP6Y is shipped with a PSM900-AC power supply module. One more power supply module needs to be purchased separately.
**By default, both PWR1 and PWR2 will work simultaneously in the load sharing mode. They can also work simultaneously in the redundant power supply mode: for S6500-24GP4XF/S6500-48GP6XF/S650024MPP4Y/S6500-48MPP6Y, you can specify the primary power supply and the backup power supply according to your needs; for S6500-24M4Y/S6500-48M6Y, you can only set PWR1 as the primary power supply and PWR2 as the backup power supply. Generally, the primary power supply takes priority over the backup power supply.
***All 10 Gbps SFP+ slots and 25 Gbps SFP28 slots can be used as uplink ports or stacking ports. When used as stacking ports, the slots need to run at the highest speed.
Cyflwyniad 05
Omada Campus Stackable L3 Managed Switch The front panel of S7500-26XF6Y is shown as the following figure.
Porth Rheoli
LED
Console Port USB3.0 Port
(RJ45/Math-C)
Dewis Modd
Botwm
10G SFP+ Slot (Port 1-26)
The front panel of S7500-48XF4C is shown as the following figure.
LED 25G SFP28 Slot (Port 27-32)
Botwm Dewis Modd
Porth Rheoli
LED Console Port USB3.0 Port (Type-C/RJ45)
10G SFP+ Slot (Port 1-48)
The front panel of S7500-24Y4C is shown as the following figure.
100G QSFP28 Slot LED (Port 49-52)
Porth Rheoli
LED
Porth USB3.0
Porthladd Consol
(RJ45/Math-C)
Botwm Dewis Modd
Slot SFP25 28G
LED
(Porth 1-24)
The front panel of S7500-48Y8C is shown as the following figure.
Slot QSFP100 28G (Porthladd 25-28)
LED Mode Selection Button
25G SFP28 Slot (Port 1-48)
06 Rhagymadrodd
Slot QSFP100 28G (Porthladd 49-56)
Omada Campus Stackable L3 Managed Switch The front panel of S7500-32C is shown as the following figure.
Botwm Dewis Modd
Rheoli Porthladd LED
Porth USB3.0
Console Port (Type-C/RJ45)
Slot QSFP100 28G
LED
Note: S7500-24Y4C and S7500-48Y8C are designed for installation in Network Telecommunications Facilities (NTFs) where ambient temperature and humidity are controlled.
LED Indication LED
PWR1* PWR2
SYS FAN
MGMT
MST
Port 1-26 of S7500-26XF6Y/ Port 1-48 of S7500-48XF4C
(Pan fydd y SPD LED ymlaen)
Port 1-24 of S7500-24Y4C/ Port 1-48 of S7500-48Y8C
(When the SPD/SPEED LED is on)
Dynodiad
Green On: The power supply works properly. Green Flashing: The power supply module is not plugged in properly or not compatible with the switch. Yellow On: The power supply works properly but the switch is powered by the other power supply.** Yellow Flashing: The power supply module is plugged in properly but there’s is no AC power input; abnormal power supply. Off: No power supply module is inserted.
Fflachio: Mae'r switsh yn gweithio'n iawn. Ymlaen neu i ffwrdd: Mae'r switsh yn gweithio'n amhriodol.
Gwyrdd: Mae'r holl gefnogwyr yn gweithio'n iawn. Melyn: Nid yw'r holl gefnogwyr yn gweithio'n iawn.
Ymlaen: Mae dyfais wedi'i chysylltu â'r porthladd. Yn fflachio: Yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd.
Nodyn:
For S7500-48Y8C, this LED lights green at 1 Gbps and orange at sub-1 Gbps.
Ymlaen: Mae'r ddyfais yn gweithredu fel y switsh meistr yn nhopoleg y pentwr neu mae'n gweithio'n unigol. I ffwrdd: Mae'r ddyfais yn gweithredu fel y switsh aelod yn nhopoleg y pentwr.
Gwyrdd Ymlaen: Rhedeg ar 10 Gbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 10 Gbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 1 Gbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
Gwyrdd Ymlaen: Yn rhedeg ar 25 Gbps, ond dim gweithgaredd. Gwyrdd yn fflachio: Yn rhedeg ar 25 Gbps ac yn trosglwyddo neu'n derbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps/10 Gbps, ond dim gweithgaredd. Melyn yn fflachio: Yn rhedeg ar 1 Gbps/10 Gbps ac yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd cyfatebol.
Cyflwyniad 07
Omada Campus Stackable L3 Managed Switch
LED
Dynodiad
Port 27-32 of S7500-26XF6Y ***
(Pan fydd y SPD LED ymlaen)
Gwyrdd Ymlaen: Yn rhedeg ar 25 Gbps, ond dim gweithgaredd. Gwyrdd yn fflachio: Yn rhedeg ar 25 Gbps ac yn trosglwyddo neu'n derbyn data. Melyn Ymlaen: Yn rhedeg ar 1 Gbps/10 Gbps, ond dim gweithgaredd. Melyn yn fflachio: Yn rhedeg ar 1 Gbps/10 Gbps ac yn trosglwyddo neu'n derbyn data. I ffwrdd: Nid oes dyfais wedi'i chysylltu â'r porthladd cyfatebol.
Port 49-52 of S7500-48XF4C/
Port 25-28 of S7500-24Y4C/ Port 49-56 of S7500-48Y8C/ Port 1-32 of S7500-32C***
(When the SPD/SPEED LED is on)
Gwyrdd Ymlaen: Rhedeg ar 100 Gbps, ond dim gweithgaredd. Fflachio Gwyrdd: Rhedeg ar 100 Gbps a throsglwyddo neu dderbyn data. Melyn Ymlaen: Yn rhedeg ar 40 Gbps, ond dim gweithgaredd. Fflachio Melyn: Rhedeg ar 40 Gbps a throsglwyddo neu dderbyn data. I ffwrdd: Nid oes unrhyw ddyfais yn gysylltiedig â'r porthladd cyfatebol.
Nodyn:
For S7500-48XF4C/S7500-48Y8C/S7500-32C, the indication above applies only when the 100 Gbps QSFP28 slots work with common cables. When the slots work with 1-to-4 breakout cables, a single slot is split into four 25 Gbps interfaces. In such scenario, the LED will light green only when all four interfaces are working at 25 Gbps (maximum speed), otherwise it will light yellow. When no device is connected to any of the four interfaces, the LED will be off. (The 100 Gbps QSFP28 slots will support 1-to-4 breakout cables in a future software release.)
Port 1-32 of S7500-26XF6Y/
Port 1-48 of S7500-48XF4C/ Port 1-28 of S7500-24Y4C/ Port 1-56 of S7500-48Y8C
(Pan fydd y STK LED ymlaen)
Ar: Mae rhif y porthladd yn nodi ID yr uned yn nhopoleg y pentwr.
*By default, S7500-26XF6Y/S7500-48XF4C/S7500-24Y4C/S7500-48Y8C/S7500-32C is shipped with a PSM550-AC power supply module installed respectively. One more power supply module needs to be purchased separately. **By default, both PWR1 and PWR2 will work simultaneously in the load sharing mode. They can also work simultaneously in the redundant power supply mode with PWR1 as the primary power supply and PWR2 as the backup power supply. Generally, the primary power supply takes priority over the backup power supply. ***All 25 Gbps SFP28 slots of S7500-26XF6Y and 100 Gbps QSFP28 slots of S7500-48XF4C/S7500-24Y4C/ S7500-48Y8C/S7500-32C can be used as uplink ports or stacking ports. When used as stacking ports, the slots need to run at the highest speed.
Port Introduction (The Management Port, Console Ports, and USB Ports of S7500-48Y8C are located on the rear panel.)
Porth Rheoli Wedi'i gynllunio i gysylltu'r ddyfais ar gyfer rheoli drwyddo web, CLI or SNMP. Do not connect this port to any outdoor device, as this may induce surge and lightning damage. Console Port Designed to connect with a computer for monitoring and configuring the switch. When the switch has an RJ45 console port and a Type-C console port, console input is active on only one console port at a time. By default, the Type-C connector takes priority over the RJ45 connector, or you can change the priority through the web. Do not connect this port to any outdoor device, as this may induce surge and lightning damage. USB Port Designed to install the USB flash disk for data storage. 1000M RJ45 Port Designed to connect to the device with a bandwidth of 10Mbps, 100 Mbps or 1000 Mbps. For PoE switches, the port can also provide power for PDs.
08 Rhagymadrodd
Omada Campus Stackable L3 Managed Switch
2.5G RJ45 Port Designed to connect to the device with a bandwidth of 10 Mbps, 100 Mbps, 1000 Mbps or 2.5 Gbps. For PoE switches, the port can also provide power for PDs. 10G SFP+ Slot Designed to install the 10 Gbps/1 Gbps optical module. 25G SFP28 Slot Designed to install the 25 Gbps/10 Gbps/1 Gbps optical module. 100G QSFP28 Slot Designed to install the 100 Gbps/40 Gbps optical module. Port Feature
Model
1000M
2.5G 10G SFP+ 25G SFP28 100G QSFP28 Management Console USB
RJ45 Port RJ45 Port Slot
Slot
Slot
Porthladd
Porthladd Porthladd
S6500-24G4XF
24
/
4
/
/
S6500-48G6XF
48
/
6
/
/
S6500-24GP4XF
24
/
4
/
/
S6500-48GP6XF
48
/
6
/
/
S6500-24M4Y
/
24
/
4
/
S6500-24MPP4Y
/
24
/
4
/
S6500-48M6Y
/
48
/
6
/
S6500-48MPP6Y
/
48
/
6
/
S7500-26XF6Y
/
/
26
6
/
S7500-48XF4C
/
/
48
/
4
S7500-24Y4C
/
/
/
24
4
S7500-48Y8C
/
/
/
48
8
S7500-32C
/
/
/
/
32
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
1
2
2
Rear Panel (The figure is for demonstration only. It may differ from your actual product. )
The rear panel of S6500-24G4XF/S6500-48G6XF is shown as the following figure. The figure is for demonstration purposes only. Your switch may differ in appearance from the depicted.
Kensington Security Slot Grounding Terminal Power Socket
Locking Strap Slot
Sylwer: PWR1 yw'r prif gyflenwad pŵer ac mae'n cael blaenoriaeth dros PWR2.
Cyflwyniad 09
Omada Campus Stackable L3 Managed Switch
The rear panel of S6500-24GP4XF/S6500-48GP6XF/S6500-24MPP4Y/S6500-48MPP6Y is shown as the following figure. The figure is for demonstration purposes only. Your switch may differ in appearance from the depicted.
Slot Diogelwch Kensington
LED
Terfynell Sylfaenol
Modiwl Cyflenwad Pŵer
LED
Locking Strap Slot
Note: By default, S6500-24GP4XF is shipped with a PSM500-AC power supply module, and S650048GP6XF/S6500-24MPP4Y/S6500-48MPP6Y is shipped with a PSM900-AC power supply module. One more power supply module needs to be purchased separately. Both PWR 1 and PWR2 can work simultaneously, or you can specify the primary power supply and the backup power supply according to your needs. Generally, the primary power supply takes priority over the backup power supply.
The rear panel of S6500-24M4Y/S6500-48M6Y/S7500-26XF6Y/S7500-48XF4C/S7500-24Y4C is shown as the following figure. The figure is for demonstration purposes only. Your switch may differ in appearance from the depicted.
Terfynell Sylfaenol
LED
Power Supply Module Locking Strap Slot
LED
Slot Diogelwch Kensington
Note: By default, the device is shipped with a PSM550-AC power supply module installed. One more power supply module needs to be purchased separately. When the switch has two power supply modules installed, both PWR1 and PWR2 will work simultaneously in the load sharing mode by default. They can also work simultaneously in the redundant power supply mode: for S6500-24M4Y/S6500-48M6Y, you can only set PWR1 as the primary power supply and PWR2 as the backup power supply; for S7500-26XF6Y/S7500-48XF4C/S7500-24Y4C, you can specify the primary power supply and the backup power supply according to your needs; Generally, the primary power supply takes priority over the backup power supply.
Dangosir panel cefn yr S7500-48Y8C fel y ffigur canlynol. At ddibenion arddangos yn unig y mae'r ffigur. Gall ymddangosiad eich switsh fod yn wahanol i'r hyn a ddangosir.
Terfynell Sylfaenol
LED
LED
Strap Cloi
Slot
Modiwl Cyflenwad Pŵer
10 Rhagymadrodd
ManagemeC(nTtoyPnposeor-tCle/RPJoU4rt5S)B3P.o0wPeorrSt upplyLoMcokdiSnulgoletStraLpED
Omada Campus Stackable L3 Managed Switch
Note: By default, the device is shipped with a PSM550-AC power supply module installed. One more power supply module needs to be purchased separately. When the switch has two power supply modules installed, both PWR1 and PWR2 will work simultaneously in the load sharing mode by default. They can also work simultaneously in the redundant power supply mode with PWR1 as the primary power supply and PWR2 as the backup power supply. Generally, the primary power supply takes priority over the backup power supply.
The rear panel of S7500-32C is shown as the following figure. The figure is for demonstration purposes only. Your switch may differ in appearance from the depicted.
LED LED
Locking Strap Slot
Slot Diogelwch Kensington Modiwl Cyflenwad Pŵer
Terfynell Sylfaenol
LED
Locking Strap Slot
Modiwl Cyflenwad Pŵer
Note: By default, the device is shipped with a PSM550-AC power supply module installed. One more power supply module needs to be purchased separately. When the switch has two power supply modules installed, both PWR1 and PWR2 will work simultaneously in the load sharing mode by default. They can also work simultaneously in the redundant power supply mode with PWR1 as the primary power supply and PWR2 as the backup power supply. Generally, the primary power supply takes priority over the backup power supply.
Power Supply Module The pluggable power supply module PSM500-AC/PSM900-AC/PSM550-AC is an AC-input power supply module. It can convert the input voltage to 53.5 V (12 V for PSM550-AC) with the maximum output power of 500 W/900 W/550 W respectively. Kensington Security Slot Secure the lock (not provided) into the security slot to prevent the device from being stolen.
Grounding Terminal The switch already comes with lightning protection mechanism. You can also ground the switch through the PE (Protecting Earth) cable of AC cord or with Ground Cable. For detailed lightning protection measures, refer to the Lightning Protection Guide from: https://support.omadanetworks.com/r/1004/. Locking Strap Slot Remove the instruction label and insert the AC power cable locking strap into the slot to secure the power cable.
Cyflwyniad 11
Omada Campus Stackable L3 Managed Switch
Pennod 2 Gosod
2.1 Cynnwys Pecyn
Sicrhewch fod y pecyn yn cynnwys yr eitemau canlynol. Cysylltwch â'ch dosbarthwr, os oes unrhyw un o'r eitemau rhestredig wedi'u difrodi neu ar goll. Mae'r ffigurau ar gyfer arddangosiad yn unig. Gall yr eitemau gwirioneddol fod yn wahanol o ran ymddangosiad a maint i'r rhai a ddarlunnir.
Switsh
Cord Pŵer a Chebl Consol
Canllaw Gosod
Datrysiad Rhwydweithio Busnes
Canllaw Gosod
Omada Campus Stackable L3 Managed Switch
Mowntio cromfachau, sgriwiau a thraed rwber
2.2 Rhagofalon Diogelwch
Er mwyn osgoi unrhyw ddifrod i ddyfais ac anaf corfforol a achosir gan ddefnydd amhriodol, dylech gadw at y rheolau canlynol.
Rhagofalon Diogelwch Cadwch y pŵer i ffwrdd yn ystod y gosodiad. Gwisgwch strap arddwrn atal ESD, a gwnewch yn siŵr bod gan y strap arddwrn gysylltiad da â'r croen a'i fod
wedi'i seilio'n dda. Defnyddiwch y llinyn pŵer a ddarperir gyda'r switsh yn unig. Gwnewch yn siŵr bod y cyflenwad yn llawntage yn cyfateb i'r manylebau a nodir ar y panel cefn y
swits. Sicrhewch fod y switsh wedi'i osod mewn amgylchedd wedi'i awyru'n dda ac nid yw ei dwll awyru
rhwystro. Peidiwch ag agor na thynnu clawr y switsh. Cyn glanhau'r ddyfais, torrwch y cyflenwad pŵer i ffwrdd. Peidiwch â'i lanhau gan y brethyn dyfrllyd, a byth
use any other liquid cleaning method. Place the device with its bottom surface facing downwards. Only instructed person or skilled person can be allowed to install, replace, or service this device.
Gofynion y Safle
Tymheredd / Lleithder
12 Gosod
Omada Campus Stackable L3 Managed Switch Keep the equipment room at an appropriate level of temperature and humidity. Too much or too little humidity may lead to bad insulation, leakage of electricity, mechanical property changes, and corrosion. High temperatures may accelerate aging of the insulation materials, significantly shortening the service life of the device. To find out the best temperature and humidity conditions for the device, check the Appendix B Specifications. Clearness
Gall y llwch a gronnir ar y switsh gael ei amsugno gan drydan statig ac arwain at gyswllt gwael â phwyntiau cyswllt metel. Cymerwyd rhai mesurau i'r ddyfais atal trydan statig, ond gall trydan statig rhy gryf achosi niwed marwol i'r elfennau electronig ar y bwrdd cylched mewnol. Er mwyn osgoi effaith trydan statig ar weithrediad y switsh, rhowch lawer o bwys ar yr eitemau canlynol: Llwchwch y ddyfais yn rheolaidd, a chadwch yr aer dan do yn lân. Cadwch y ddyfais wedi'i seilio'n dda a sicrhewch fod y trydan statig wedi'i drosglwyddo. Ymyrraeth electromagnetig
Gall ymyriadau allanol effeithio ar elfennau electronig gan gynnwys cynhwysedd ac anwythiad ar y ddyfais, megis allyriadau dargludol trwy gyplu cynhwysedd, cyplu anwythiad, a chyplu rhwystriant. I leihau'r ymyriadau, gwnewch yn siŵr eich bod yn cymryd y mesurau canlynol: Defnyddiwch y cyflenwad pŵer a all hidlo ymyrraeth o'r grid pŵer yn effeithiol. Cadwch y ddyfais ymhell o ddyfeisiau amledd uchel a cherrynt cryf fel trawsyrru radio
gorsaf. Defnyddiwch gysgodi electromagnetig pan fo angen. Amddiffyniad Mellt
Gosodiad 13
Omada Campus Stackable L3 Managed Switch
Cyfrol hynod o ucheltagGellir cynhyrchu cerrynt e yn syth pan fydd mellt yn digwydd a gellir cynhesu'r aer yn y llwybr rhyddhau trydan ar unwaith hyd at 20,000 ° C. Gan fod y cerrynt gwib hwn yn ddigon cryf i niweidio dyfeisiau electronig, dylid cymryd mesurau amddiffyn mellt mwy effeithiol. Sicrhewch fod y rac a'r ddyfais wedi'u daearu'n dda. Sicrhewch fod gan y soced pŵer gysylltiad da â'r ddaear. Cadwch system geblau rhesymol ac osgoi mellt a achosir. Defnyddiwch y signal SPD (Dyfais Amddiffynnol Ymchwydd) wrth weirio yn yr awyr agored.
Nodyn: Am fesurau amddiffyn rhag mellt manwl, cyfeiriwch at y Canllaw Diogelu rhag Mellt o: https://support.omadanetworks.com/r/1004/. Safle Gosod
When installing the device on a rack or a flat workbench, attach much importance to the following items: Install the device with its bottom surface facing down only. This equipment is not suitable for use in locations where children are likely to be present. The rack or workbench is flat, stable, and sturdy enough to support the weight of 9.5 kg at least. The rack or workbench has a good ventilation system. The equipment room is well ventilated. The rack is well grounded. Keep the device less than 1.5 meters away from the power socket.
2.3 Offer Gosod
Sgriwdreifer Phillips Ceblau lapio arddwrn ataliol ESD
Nodyn: Nid yw'r offer hyn wedi'u cynnwys gyda'n cynnyrch. Os oes angen, gallwch eu prynu ar wahân.
2.4 Gosod Cynnyrch
Mae'r switsh wedi'i gynllunio gyda nodwedd afradu gwres blaen wrth gefn. Pan fydd yn gweithio, mae'r aer yn cylchredeg fel y dangosir isod. Er mwyn cael afradu gwres yn well, gosodwch y ddyfais mewn amgylchedd wedi'i awyru'n dda a gadewch fylchau 5 i 10 cm o amgylch y ddyfais.
14 Gosod
Ffigur 2-1
Cylchrediad Awyr
Omada Campus Stackable L3 Managed Switch
Gosod Penbwrdd
I osod y ddyfais ar y bwrdd gwaith, dilynwch y camau:
1. Gosodwch y ddyfais ar arwyneb gwastad sy'n ddigon cryf i gynnal pwysau cyfan y ddyfais gyda'r holl ffitiadau.
2. Tynnwch y papurau cefn gludiog o'r traed rwber.
3. Atodwch y traed rwber i waelod y ddyfais i'w atal rhag llithro wrth ei osod ar bwrdd gwaith.
Ffigur 2-2
Gosod Penbwrdd
Traed gwaelod rhicyn y ddyfais
Gosod Rack
Mae'r pecyn yn cynnwys 6 pâr o wahanol fracedi mowntio rac, dangosir eu lluniau isod a gallant fod yn wahanol i'r cynhyrchion gwirioneddol.
Ffigur 2-3
Mowntio cromfachau
Grŵp Twll Sgriw 2
Bracket D Bracket C Bracket B Bracket A
Grŵp Twll Sgriw 1
Grŵp Twll Sgriw 3
Braced F
Screw Hole Group 4-2 (for device with 420mm depth)
Grŵp Twll Sgriw 5
Twll Sgriw
Grŵp 4-1
Screw Hole Group 4-3
(for device with 380mm depth)
(for device with
460mm depth)
Braced E
Gosodiad 15
Omada Campus Stackable L3 Managed Switch
Before installing the device in an EIA standard-sized, 19-inch rack, please check the efficiency of the grounding system and the stability of the rack, then wear an ESD-preventive wrist strap, and make sure that it has good skin contact and is well grounded. Bracket B, C & E have two adjustable ears, please measure the distance between the front-post rack and the rear-post rack, and determine a suitable mounting method from below:
Dull
Arddangosiad
Front: Bracket A Rear: Bracket D (Screw Hole Group 1) + Bracket B (Ear towards back)
Pellter Rac
(For device with a depth of 380mm)
Pellter Rac
(For device with a depth of 420mm)
Pellter Rac
(For device with a depth of 460mm)
498-640mm 538-680mm 578-720mm
Front: Bracket A Rear: Bracket D (Screw Hole Group 1) + Bracket C (Ear towards back)
477-498mm 517-538mm 557-578mm
Front: Bracket A Rear: Bracket D (Screw Hole Group 2) + Bracket C (Ear towards back)
429-477mm 469-517mm 509-557mm
Front: Bracket A Rear: Bracket D (Screw Hole Group 2) + Bracket C (Ear towards front)
410-429mm 450-469mm 490-509mm
Front: Bracket A Rear: Bracket D (Screw Hole Group 3) + Bracket C (Ear towards back)
357-410mm 397-450mm 437-490mm
Front: Bracket A Rear: Bracket D (Screw Hole Group 2) + Bracket B (Ear towards back)
282-410mm 322-450mm 362-490mm
16 Gosod
Omada Campus Stackable L3 Managed Switch
Front: Bracket A Rear: Bracket F (Screw Hole Group 4) + Bracket E (Ear towards back)
555-936mm 555-936mm 555-936mm
Front: Bracket A Rear: Bracket F (Screw Hole Group 5) + Bracket E (Ear towards back)
743-1121mm 743-1121mm 743-1121mm
I osod y ddyfais, dilynwch y cyfarwyddiadau a ddisgrifir isod:
1. Attach the M6 nuts to the racks.
Ffigur 2-4
Sicrhau Cnau M6
×8
2. Attach the mounting brackets (B, C or E) to the rear-post racks and secure them with the provided M6 screws, as illustrated in the following figure.
Ffigur 2-5
Gosod Bracedi ar Raciau
or
3. Attach the brackets A & D/F to the switch with the provided M3 screws.
Gosodiad 17
Omada Campus Stackable L3 Managed Switch
Ffigur 2-6
Gosod Bracedi ar Switsh
4. After the brackets are attached to the device, hold the switch with attached brackets up until it aligns with the brackets on the racks, and gently push the switch backwards until it is in place, then secure the device on the racks with M6 screws and fix brackets B/C or E to brackets D or F with M4 screws on both sides.
Ffigur 2-7
Gosod Switsh ar Raciau
Caution: Leave 5 to 10 cm gaps around the devices for air circulation. Avoid placing heavy things on the device. Mount devices in the order demonstrated above and ensure a certain clearance between devices for
the purpose of heat dissipation.
18 Gosod
Omada Campus Stackable L3 Managed Switch
Gosod Modiwl Cyflenwad Pŵer
S6500-24GP4XF is shipped with a PSM500-AC power supply module installed, S6500-48GP6XF/ S6500-24MPP4Y/S6500-48MPP6Y is shipped with a PSM900-AC power supply module installed, and S6500-24M4Y/S6500-48M6Y/S7500-26XF6Y/S7500-48XF4C/S7500-24Y4C/S7500-48Y8C/S750032C is shipped with a PSM550-AC power supply module installed. It looks like below, and the image may differ from your actual product.
Ffigur 2-8
Ymddangosiad y Modiwl Cyflenwad Pŵer
AC Power Cord Connector
FAN
Clipiau Cadw
Dolen Echdynnu
LED
Locking Strap Slot Release Handle
Os oes angen i chi ychwanegu un modiwl cyflenwad pŵer arall, dilynwch y camau:
1. Gwisgwch strap arddwrn sy'n atal ESD, a gwnewch yn siŵr ei fod mewn cysylltiad da â'r croen ac wedi'i seilio'n dda.
2. Pwyswch ddolen echdynnu'r modiwl gydag un llaw, a daliwch waelod y modiwl gan ddefnyddio'ch llaw arall. Gwthiwch y modiwl yn ysgafn i mewn ar hyd rheilen ganllaw'r slot.
3. Rhyddhewch y ddolen echdynnu i osod y modiwl cyflenwad pŵer yn ei le.
Ffigur 2-9
Gosod y Modiwl Cyflenwad Pwer
Trin Rhyddhau
Caution: Do not plug the power cord until the power supply module installation is completed. When installing a power supply module, make sure it is set correctly in the operation of installation. Do not use too much force in the installation. If resistance is encountered or positions of the power
supply module appear larger during installation, you must first remove the module and then reinstall the module. If the Retainer Clips cannot spring up naturally and the power module is blocked, it may be due to the power supply module is not installed properly. Please check carefully.
The power supply module is designed with a locking strap slot. If you need to secure the power cable with the included locking strap, please follow the steps:
1. Gwisgwch strap arddwrn sy'n atal ESD, a gwnewch yn siŵr ei fod mewn cysylltiad da â'r croen ac wedi'i seilio'n dda.
Gosodiad 19
Omada Campus Stackable L3 Managed Switch
2. Remove the instruction label on the AC power cable locking strap slot. 3. Attach the clamp to the AC power cable and insert the locking strap into the slot. 4. Adjust tightness and distance of the locking strap using clips to ensure the cable is securely fastened.
Figure 2-10 Installing the Locking Strap
Os oes angen i chi gael gwared ar y modiwl cyflenwad pŵer, dilynwch y camau:
1. Gwisgwch strap arddwrn sy'n atal ESD, a gwnewch yn siŵr ei fod mewn cysylltiad da â'r croen ac wedi'i seilio'n dda.
2. Depress the retainer clip to release the locking strap, and then remove the power cord from the external power supply system and the power module.
3. Press the extraction handle of the module with one hand, and pull the extraction handle using your other hand, until the module completely comes out of the chassis.
Caution: Unplug the power cord first, then remove the power supply module. When removing a power supply module, make sure that the power supply module is set correctly in the
operation of installation. In order to better protect the power supply module during removal, it is recommended that you
package it in an antistatic bag.
Gosod Modiwl Ffan
S6500-24GP4XF/S6500-48GP6XF/S6500-24M4Y/S6500-24MPP4Y/S6500-48M6Y/S650048MPP6Y/S7500-26XF6Y/S7500-48XF4C/S7500-24Y4C/S7500-48Y8C/S7500-32C is shipped with hot-swappable fan modules installed. They look like below, and the images may differ from your actual product.
Ffigur 2-11 Ymddangosiad y Modiwl Fan
LED
20 Gosod
Extraction Handle Retainer Clips Release Handle
Omada Campus Stackable L3 Managed Switch For normal operation of the switch, please ensure that models with 5 fan modules maintain at least 4 operational modules, while models with 4 fan modules maintain at least 3 operational modules. If one fan module is damaged, please replace it as follows: 1. Wear an ESD-preventive wrist strap, and make sure that it has good skin contact and is well
wedi'i seilio. 2. Pwyswch ddolen echdynnu'r modiwl gydag un llaw, a thynnwch y ddolen echdynnu nes bod y
mae'r modiwl yn dod allan o'r siasi yn llwyr.
Ffigur 2-12 Tynnu Modiwl Ffan wedi'i Ddifrodi
3. Press the extraction handle of a new fan module with one hand, and hold the bottom of the module using your other hand. Gently push the module in along the slot guide rail.
4. Release the extraction handle to fix the power supply module in place. Caution: S6500-24GP4XF/S6500-48GP6XF/S6500-24M4Y/S6500-24MPP4Y/S6500-48M6Y/S6500-48MPP6Y/ S7500-26XF6Y uses hot-swappable fan modules with a maximum speed of 9,000 RPM. S7500-48XF4C/ S7500-24Y4C/S7500-48Y8C/S7500-32C uses hot-swappable fan modules with a maximum speed of 18,000 RPM. Please do not interchange or mix fan modules between models. Sharp edges on the fan module may cause injury, so please operate with caution. Make sure the damaged fan module is in place before you are going to replace it. DO NOT unplug the damaged fan module until the replacement operation. Do not use too much force in the replacement. If resistance is encountered or positions of the fan module appear larger during installation, you must first remove the module and then reinstall the module. If the Retainer Clips cannot spring up naturally and the power module is blocked, it may be due to the fan module is not installed properly. Please check carefully.
Gosodiad 21
Omada Campus Stackable L3 Managed Switch
Pennod 3 Cysylltiad
3.1 Porthladd Ethernet
Cysylltwch borthladd Ethernet o'r switsh i'r cyfrifiadur trwy gebl RJ45 fel y dengys y ffigur canlynol.
Ffigur 3-1
Cysylltu'r Porthladd RJ45
Port RJ45
Cebl RJ45
3.2 10G SFP+/25G SFP28/100G QSFP28 Slot
The following figure demonstrates the connection of 10G SFP+/25G SFP28/100G QSFP28 slot to an optical module
Ffigur 3-2
Inserting the Fiber Module
Slot Fiber Module
3.3 Porth Consol
Mae CLI (Rhyngwyneb Llinell Gorchymyn) yn eich galluogi i reoli'r switsh, felly gallwch lwytho'r CLI ar ôl cysylltu'r cyfrifiaduron personol neu'r terfynellau â phorthladd y consol ar y switsh trwy gebl (darperir cebl consol RJ45, tra nad yw cebl Math-C yn cael ei ddarparu)
Cysylltwch borthladd consol RJ45 y ddyfais â'ch cyfrifiadur gan y cebl consol fel y dengys y ffigur canlynol.
22 Cysylltiad
Ffigur 3-3
Cysylltu'r Porth Consol (RJ45).
Omada Campus Stackable L3 Managed Switch
Cysylltwch borthladd consol Math-C y ddyfais â'ch cyfrifiadur gan y cebl Math-C (heb ei ddarparu) fel y dengys y ffigur canlynol.
Ffigur 3-4
Cysylltu'r Porth Consol (USB).
Note: RJ45 console port and Type-C console port cannot be used concurrently. Type-C Console port takes
priority over the RJ45 console port. The Type-C console port is hot-pluggable while the RJ45 console port is not. Keep the device power
off when plugging the console cable into the RJ45 console port. Do not connect the console port with other ports by RJ45 cable.
3.4 Gwirio Gosod
Ar ôl cwblhau'r gosodiad, gwiriwch yr eitemau canlynol: Dylai fod 5 i 10 cm o gliriad o amgylch y ddyfais ar gyfer awyru a gwnewch yn siŵr bod y llif aer
yn ddigonol. Y cyftage o'r cyflenwad pŵer yn bodloni gofyniad y mewnbwn cyftage o'r ddyfais. Mae'r soced pŵer, y ddyfais a'r rac wedi'u seilio'n dda. Mae'r ddyfais wedi'i chysylltu'n gywir â dyfeisiau rhwydwaith eraill.
Cysylltiad 23
Omada Campus Stackable L3 Managed Switch
3.5 Pwer Ymlaen
Plygiwch gysylltydd benywaidd y llinyn pŵer a ddarperir i mewn i soced pŵer y ddyfais a phlygiwch y cysylltydd positif i mewn i allfa bŵer fel y dengys y ffigur canlynol. Gwnewch yn siŵr bod y cyftage o'r cyflenwad pŵer yn bodloni gofyniad y mewnbwn cyftage (100-240 V ~ 50/60 Hz).
Ffigur 3-5
Cysylltu â Chyflenwad Pŵer
Note: The figure is to illustrate the application and principle. The provided plug and module in your region
may differ from the figures above. Generally PWR1 takes priority over PWR2.
3.6 Cychwyn
Ar ôl i'r ddyfais gael ei phweru ymlaen, mae'n dechrau'r Hunan-Brawf Power-On. Mae cyfres o brofion yn rhedeg yn awtomatig i sicrhau bod y ddyfais yn gweithredu'n iawn. Yn ystod yr amser hwn, bydd ei ddangosyddion LED yn ymateb yn y drefn a ganlyn:
1. Mae'r dangosydd PWR LED yn goleuo trwy'r amser. Mae'r SYS LED a dangosyddion LED yr holl borthladdoedd yn cadw i ffwrdd.
2. Ar ôl tua un munud, bydd dangosyddion SYS LED a LED yr holl borthladdoedd yn fflachio am ennyd ac yna'n diffodd.
3. Sawl eiliad yn ddiweddarach, bydd dangosydd SYS LED yn fflachio, sy'n cynrychioli cychwyn llwyddiannus.
3.7 Topoleg Pentwr
With stackable design, the switches can be stacked into one stack topology for higher reliability, larger bandwidth, and simpler networking. To build the stack topology, you need to prepare 2-12 switches and enough 10G SFP+/25G SFP28/100G QSFP28 modules/cables. For more details, see the table below:
Switsh
Model(au) sy'n gydnaws
Nifer
S6500-24G4XF S6500-24G4XF, S6500-48G6XF, S6500-24GP4XF, S6500-48GP6XF S6500-48G6XF S6500-24G4XF, S6500-48G6XF, S6500-24GP4XF, S6500-48GP6XF S6500-24GP4XF S6500-24G4XF, S6500-48G6XF, S6500-24GP4XF, S6500-48GP6XF S6500-48GP6XF S6500-24G4XF, S6500-48G6XF, S6500-24GP4XF, S6500-48GP6XF S6500-24M4Y S6500-24M4Y, S6500-24MPP4Y, S6500-48M6Y, S6500-48MPP6Y S6500-24MPP4Y S6500-24M4Y, S6500-24MPP4Y, S6500-48M6Y, S6500-48MPP6Y
2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode)
24 Cysylltiad
Omada Campus Stackable L3 Managed Switch
S6500-48M6Y S6500-24M4Y, S6500-24MPP4Y, S6500-48M6Y, S6500-48MPP6Y
S6500-48MPP6Y S6500-24M4Y, S6500-24MPP4Y, S6500-48M6Y, S6500-48MPP6Y
S7500-26XF6Y S7500-26XF6Y
S7500-48XF4C S7500-48XF4C
S7500-24Y4C S7500-24Y4C
S7500-48Y8C S7500-48Y8C
S7500-32C
S7500-32C
2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode) 2-12 (max 12 in standalone mode, max 4 in controller mode)
Mae yna dri strwythur topoleg pentwr ar gyfer gwahanol senarios, adeiladwch y topoleg gywir yn unol â'ch anghenion:
1. Topoleg Gadwyn: Mae topoleg y gadwyn yn gymharol syml ac nid oes angen cysylltiad cebl rhwng yr uned gyntaf a'r uned olaf. Mae'n addas ar gyfer pentyrru pellter hir, ond mae ei ddibynadwyedd yn gymharol isel.
Ffigur 3-6
Topoleg Cadwyn
Grŵp Pentyrru Porthladd 2
Grŵp Pentyrru Porthladd 1
…
2. Topoleg y Cylch: Mae gan dopoleg y cylch ddibynadwyedd uwch o gymharu â thopoleg y gadwyn. Pan fydd un o'r cadwyni yn y topoleg cylch wedi'i ddatgysylltu, mae topoleg y cylch yn dod yn dopoleg cadwyn, ond gall y system stac gyfan weithio'n normal o hyd. Mae topoleg y cylch yn gofyn am gysylltiad cebl rhwng yr uned gyntaf a'r uned olaf, felly nid yw'n addas ar gyfer pentyrru pellter hir.
Ffigur 3-7
Topoleg Ring
Grŵp Pentyrru Porthladd 2
Grŵp Pentyrru Porthladd 1
…
Cysylltiad 25
Omada Campus Stackable L3 Managed Switch
3. Topoleg Seren: Mae topoleg seren yn cysylltu'r switshis â phrif switsh canolog, felly, gall gynyddu'n sylweddol y gyfradd anfon data rhwng switshis aelodau tra'n darparu rheolaeth unedig.
Ffigur 3-8
Topoleg Seren
Grŵp Pentyrru Porthladd 2
Grŵp Pentyrru Porthladd 3
Grŵp Pentyrru Porthladd 1
…
Note: The stacking port is not allowed to connect to non-stacking port, as it may affect the operation of the
device. Stacking ports with the same group ID are not allowed to connect to stacking ports with different
group IDs, neither to different devices. A stacking port group is a logical port dedicated to stacking and needs to be bound to a stacking port.
A stacking port group can be bound to one or more stacking ports to improve bandwidth and reliability.
26 Cysylltiad
Omada Campus Stackable L3 Managed Switch
Pennod 4 Ffurfwedd
4.1 Ffurfweddiad Drosview
Mae'r switsh yn cefnogi dau opsiwn cyfluniad:
Modd Standalone: Ffurfweddu a rheoli'r switsh yn unigol. Modd Rheolwr: Ffurfweddu a rheoli'r dyfeisiau rhwydwaith yn ganolog. Argymhellir yn y
rhwydwaith ar raddfa fawr, sy'n cynnwys dyfeisiau torfol fel pwyntiau mynediad, switshis a phyrth.
Nodyn: Pan fydd y switsh yn cael ei newid o'r Modd Arunig i'r Modd Rheolwr, collir cyfluniadau'r switsh. Am fanylion, cyfeiriwch at y dogfennau cysylltiedig ar ganolfan lawrlwytho ein swyddog webgwefan: https://support.omadanetworks.com/product/.
4.2 Modd Arunig
Yn Modd Standalone, defnyddiwch gyfrifiadur i ffurfweddu a rheoli'r switsh gan ddefnyddio GUI (Rhyngwyneb Defnyddiwr Graffigol) neu CLI (rhyngwyneb llinell orchymyn).
Ffigur 4-1
Topoleg ar gyfer Modd Arunig
Switsh
PC
Defnyddio'r GUI
1. I gyrchu tudalen reoli'r switsh, gwnewch yn siŵr bod y switsh a'r cyfrifiadur yn yr un isrwyd. Agorwch borwr a theipiwch gyfeiriad IP y switsh yn y maes cyfeiriad, yna pwyswch y fysell Enter.
Os yw'r switsh yn cael cyfeiriad IP gan y gweinydd DHCP (porth fel arfer), dewch o hyd i gyfeiriad IP y switsh ar y gweinydd DHCP.
Os na, defnyddiwch y cyfeiriad IP diofyn 192.168.0.1 i lansio tudalen reoli'r switsh.
2. Y tro cyntaf i chi fewngofnodi, gosodwch yr enw defnyddiwr a'r cyfrinair i amddiffyn eich rhwydwaith a'ch dyfeisiau'n well. Ar ôl hynny, bydd y system yn eich ailgyfeirio'n awtomatig yn ôl i'r rhyngwyneb mewngofnodi i ddilysu gyda'r manylion mewngofnodi newydd eu creu.
3. Ar ôl mewngofnodi'n llwyddiannus, bydd y brif dudalen yn ymddangos. Gallwch glicio ar y bwydlenni ar yr ochr uchaf a'r ochr chwith i ffurfweddu'r swyddogaethau cyfatebol.
Am y cyfluniadau manwl, cyfeiriwch at y Canllaw Defnyddiwr a'r Canllaw CLI. Gellir dod o hyd i'r canllawiau yng nghanolfan lawrlwytho ein swyddog webgwefan: https://support.omadanetworks.com/product/.
Defnyddio'r CLI Sefydlu cysylltiad Telnet neu SSH i gael mynediad i'r switsh trwy CLI.
Ffurfwedd 27
Omada Campus Stackable L3 Managed Switch
Defnyddiwch y porth consol i gael mynediad i'r switsh. Wrth ddefnyddio'r porthladd consol, dechreuwch y rhaglen efelychu terfynell (fel yr Hyper Terminal) ar y cyfrifiadur personol a ffurfweddwch y rhaglen efelychu terfynell fel a ganlyn:
Cyfradd Baud 38400 bps
Darnau Data 8
Cydraddoldeb Dim
Darnau Stop 1
Rheoli Llif Dim
Am y cyfluniadau manwl, cyfeiriwch at y Canllaw Defnyddiwr a'r Canllaw CLI. Gellir dod o hyd i'r canllawiau yng nghanolfan lawrlwytho ein swyddog webgwefan: https://support.omadanetworks.com/product/.
Note: You may need to change the password the first time you log in, which will better protect your network and devices.
4.3 Modd Rheolydd
Controller Mode applies to the large scale network with mass devices. All devices can be centrally configured and monitored via Omada Pro Hardware Controller (C5300), Omada Pro Software Controller, or Omada Pro Cloud-Based Controller.
Note: Before the following configurations, make sure the switch can access the internet. When using Omada Pro Hardware/Software/Cloud-based Controller, make sure the switch and the controller are in the same subnet. Typically, the switch obtains IP address from the DHCP server. You can check the switch’s IP address on the DHCP server.
Via Omada Pro Hardware Controller (C5300)
Omada Pro Hardware Controller (C5300) is a good alternative if you have no spare PC to keep running Omada Pro Software Controller in the network. It needs to be purchased additionally. Follow the steps below to configure the Omada Pro Hardware Controller (C5300).
Ffigur 4-2
Manage the network via Omada Pro Hardware Controller (C5300)
Switsh Porth
Omada Pro Hardware Controller (C5300) EAP
28 Cyfluniad
EAP
EAP
Cleientiaid
Omada Campus Stackable L3 Managed Switch
Note: Before you start, be sure to power up and connect your devices according to the topology figure. A DHCP server (typically a gateway with DHCP function enabled) is required to assign IP addresses to
the EAPs and clients in your local network. Omada Pro Controller must have network access to some Omada campus devices (the gateway,
switch, or APs) in order to find, adopt, and manage them.
1. Dewch o hyd i gyfeiriad IP y porth. Agorwch y llinell orchymyn ar eich cyfrifiadur a nodwch ipconfig. Yn y rhestr ganlyniadau, dewch o hyd i'r Porth Diofyn, sydd hefyd yn gyfeiriad IP y porth.
2. Lansio a web porwr a nodwch gyfeiriad IP y porth. Mewngofnodwch i'r porth web tudalen. Yna ewch i Rhwydwaith> LAN> Rhestr Cleientiaid DHCP i ddod o hyd i gyfeiriad IP eich rheolydd yn ôl ei gyfeiriad MAC.
3. Rhowch gyfeiriad IP y eich rheolydd yn y bar cyfeiriad i agor ei web tudalen.
4. Ar Reolydd Omada Pro web tudalen, dilynwch y dewin i gwblhau'r gosodiad cyflym.
5. Ar ôl y setup cyflym, mae'r dudalen fewngofnodi yn ymddangos. Rhowch yr enw defnyddiwr a'r cyfrinair rydych chi wedi'i greu a chlicio Mewngofnodi. Yna gallwch chi ffurfweddu'r rheolydd ymhellach.
6. Os ydych am reoli'r dyfeisiau o bell, dilynwch y camau nesaf:
a. Sicrhewch fod Cloud Access wedi'i alluogi ar eich rheolydd. Yn ddiofyn, mae Cloud Access wedi'i alluogi. Gwnewch yn siŵr bod y Cloud LED yn fflachio'n araf.
b. Lansio a web porwr a rhowch https://omada.tplinkcloud.com yn y bar cyfeiriad. Rhowch eich ID TP-Link a'ch cyfrinair i fewngofnodi. Cliciwch + Ychwanegu Rheolydd a dewiswch Rheolydd Caledwedd i ychwanegu eich rheolydd. Yna gallwch chi ffurfweddu'r rheolydd ymhellach.
For more details, refer to the Installation Guide of C5300.
Trwy Reolwr Meddalwedd Omada Pro
Download the Omada Pro Software Controller on a PC with Windows OS or Linux OS. Then run the file and follow the wizard to install the Omada Pro Software Controller. Follow the steps below to configure the Controller.
Ffigur 4-3
Rheoli'r rhwydwaith trwy Reolwr Meddalwedd Omada Pro
Porth
Switsh
Rheolydd
Rheolydd Meddalwedd Omada Pro AP
AP
AP
yn rhedeg ar y Cyfrifiadur Gwesteiwr
Cleientiaid
Ffurfwedd 29
Omada Campus Stackable L3 Managed Switch
1. Launch the Omada Pro Software Controller on your PC. After the initiation process, the controller automatically opens its web tudalen. Os na, cliciwch Lansio Porwr i Reoli'r Rhwydwaith.
2. Ar Reolydd Omada Pro web tudalen, dilynwch y dewin i gwblhau'r gosodiad cyflym.
3. Ar ôl y setup cyflym, mae'r dudalen fewngofnodi yn ymddangos. Rhowch yr enw defnyddiwr a'r cyfrinair rydych chi wedi'i greu a chlicio Mewngofnodi. Yna gallwch chi ffurfweddu'r rheolydd ymhellach.
4. Os ydych am reoli'r dyfeisiau o bell, dilynwch y camau nesaf:
a. Make sure that Cloud Access is enabled on your controller and your controller has been bound with your TP-Link ID. On the Omada Pro Controller’s web tudalen, ewch i Gosodiadau> Mynediad Cwmwl i alluogi Cloud Access a rhwymwch eich ID TP-Link. Os ydych chi wedi ei sefydlu yn y gosodiad cyflym, sgipiwch y cam hwn.
b. Lansio a web porwr a rhowch https://omada.tplinkcloud.com yn y bar cyfeiriad. Rhowch eich ID TP-Link a'ch cyfrinair i fewngofnodi. Bydd rhestr o reolwyr sydd wedi'u rhwymo â'ch ID TP-Link yn ymddangos. Yna gallwch chi glicio Lansio i ffurfweddu'r rheolydd ymhellach.
Note: To manage your devices, Omada Pro Software Controller needs to keep running on your computer.
Trwy Omada Pro Rheolwr Seiliedig ar Gwmwl
Mae Rheolydd Seiliedig ar Gwmwl Omada Pro yn ddewis arall da heb fod angen gosod y rheolydd meddalwedd ar gyfrifiadur personol.
Mae angen prynu trwyddedau yn ychwanegol.
Ffigur 4-4
Rheoli'r rhwydwaith trwy Reolwr Cwmwl Omada Pro
Cwmwl Omada
Porth
Switsh
AP
AP
AP
AP
Cleientiaid
1. Contact the sales staff to grant the Omada Pro Cloud-Based Controller permission. 2. Launch a web porwr a nodwch https://omada.tplinkcloud.com yn y bar cyfeiriadau. Mewngofnodwch gyda
your TP-Link ID.
30 Cyfluniad
Omada Campus Stackable L3 Managed Switch 3. Click + Add Controller and choose Cloud-Based Controller to add an Omada Pro Controller. Then
gallwch lansio'r rheolydd i fabwysiadu a rheoli dyfeisiau. * Ap Omada Gyda'r ap Omada, gallwch hefyd reoli'ch rheolydd mewn safle lleol neu safle anghysbell trwy'ch dyfais symudol. Am y ffurfweddiadau manwl, cyfeiriwch at Ganllaw Defnyddiwr y rheolydd. Gellir dod o hyd i'r canllaw yng nghanolfan lawrlwytho ein gwefan swyddogol. webgwefan: https://support.omadanetworks.com/product/.
Ffurfwedd 31
Omada Campus Stackable L3 Managed Switch
Atodiad A Datrys Problemau
C1. Beth allwn i ei wneud pe bawn i'n anghofio enw defnyddiwr a chyfrinair y switsh?
1. Cysylltwch borthladd consol y PC i borthladd consol y switsh ac agor rhaglen efelychu terfynell.
2. Pŵer i ffwrdd ac ailgychwyn y switsh. Perfformiwch y weithred a nodir gan y rhaglen efelychu terfynell i gyrraedd y ddewislen bootUtil. Mae'r weithred yn amrywio o gynnyrch i gynnyrch. Rhestrir y camau gweithredu posibl isod: · Pwyswch unrhyw fysell i atal autoboot. · Pwyswch CTRL-B i gyrraedd y ddewislen bootUtil.
3. Bydd y ddewislen bootUtil yn cael ei dangos. Rhowch y rhif 6 i ddewis yr opsiwn “Adfer cyfrinair” a rhowch Y i ddileu’r holl ddefnyddwyr a chyfrineiriau. Yna gallwch ailosod yr enw defnyddiwr a’r cyfrinair.
C2. Pam mae'r LED PWR yn gweithio'n annormal? Dylai'r LED PWR/Power oleuo pan fydd y system bŵer yn gweithio'n normal. Os oedd yr LED PWR/Power yn gweithio'n annormal, cymerwch y camau canlynol:
1. Gwnewch yn siŵr bod y cebl pŵer wedi'i gysylltu'n iawn, a bod y cyswllt pŵer yn normal. 2. Gwnewch yn siŵr bod y cyfainttage o'r cyflenwad pŵer yn bodloni gofyniad y mewnbwn cyftage o'r
swits.
C3. Beth ddylwn i ei wneud os na allaf gael mynediad i'r web tudalen reoli? Rhowch gynnig ar y canlynol:
1. Gwiriwch bob porthladd LED ar y switsh a gwnewch yn siŵr bod y cebl Ethernet wedi'i gysylltu'n iawn. 2. Rhowch gynnig ar borthladd arall ar y switsh a gwnewch yn siŵr bod y cebl Ethernet yn addas ac yn gweithio fel arfer. 3. Pwerwch y switsh ac, ar ôl ychydig, pwerwch ef ymlaen eto. 4. Sicrhewch fod cyfeiriad IP eich PC wedi'i osod o fewn isrwyd y switsh. 5. Os na allwch gael mynediad i'r dudalen ffurfweddu o hyd, ailosodwch y switsh i'w ddiffygion ffatri. Yna
dylid gosod cyfeiriad IP eich PC fel 192.168.0.x (“x” yw unrhyw rif o 2 i 254) a mwgwd is-rwydwaith fel 255.255.255.0.
C4. Pam nad yw'r rhaglen efelychu terfynell yn ymddangos yn gywir? Rhowch gynnig ar y canlynol:
1. Sicrhewch fod y cyflenwad pŵer yn normal a bod y cebl consol wedi'i gysylltu'n iawn. 2. Gwiriwch a yw'r cebl consol y math cywir. 3. Sicrhewch fod paramedrau'r rhaglen efelychu terfynell yn gywir: ffurfweddu Bits yr eiliad
fel 38400, Didau Data fel 8, Cydraddoldeb fel Dim, Stopio darnau fel 1, a Rheolaeth Llif fel Dim.
32 Atodiad A Datrys Problemau
Omada Campus Stackable L3 Managed Switch
Atodiad B Manylebau
Specifications for S6500 Series Switches
Eitem
Cynnwys
IEEE 802.3, IEEE 802.3i, IEEE 802.3u, IEEE 802.3ab, IEEE 802.3z, IEEE 802.3ae, IEEE 802.3x
Safonau
IEEE 802.3af/at (For S6500-24GP4XF, S6500-48GP6XF) IEEE 802.3af/at/bt (For S6500-24MPP4Y, S6500-48MPP6Y)
IEEE 802.3bz, IEEE 802.3by, IEEE 802.3cc (For S6500-24M4Y, S6500-24MPP4Y, S6500-48M6Y, S6500-48MPP6Y)
10BASE-T: 2-pair UTP/STP of Cat. 3,4,5 (maximum 100 m) 100BASE-TX: 2-pair UTP/STP of Cat. 5 or above (maximum 100 m) 1000BASE-T: 4-pair UTP/STP of Cat. 5e or above (maximum 100 m) 2.5GBASE-T: 4-pair UTP/STP of Cat. 5e or above (maximum 100 m) Transmission Medium 1000BASE-SX/LX/LX10/BX10: MMF, SMF 10GBASE-SR/LR: MMF, SMF 10G SFP+ Direct Attach Cable (SM5220-1M, SM5220-3M) 25GBASE-SR/LR: MMF, SMF (SM6110-SR, SM6110-LR) 25G SFP28 Direct Attach Cable (SM6220-1M)
S6500-24G4XF/S6500-24M4Y: PWR1, PWR2, SYS, FAN, MGMT, MST, SPEED, STK, Port 1-24, Port 25-28 S6500-24GP4XF/S6500-24MPP4Y: PWR1, PWR2, SYS, FAN, PoE Max, MGMT, MST, SPEED, STK, PoE, Port 1-24, Port 25-28 LED S6500-48G6XF/S6500-48M6Y: PWR1, PWR2, SYS, FAN, MGMT, MST, SPEED, STK, Port 1-48, Port 49-54 S6500-48GP6XF/S6500-48MPP6Y: PWR1, PWR2, SYS, FAN, PoE Max, MGMT, MST, SPEED, STK, PoE, Port 1-48, Port 49-54
Atodiad B Manylebau 33
Omada Campus Stackable L3 Managed Switch
Cyllideb PoE
For S6500-24GP4XF: 402W (with 1*PSM500-AC, by default) 720W (with 1*PSM900-AC) 720W (with 2*PSM500-AC) 720W (with 1*PSM500-AC and 1*PSM900-AC) 720W (with 2*PSM900-AC) For S6500-48GP6XF: 764W (with 1*PSM900-AC, by default) 384W (with 1*PSM500-AC) 812W (with 2*PSM500-AC) 1176W (with 1*PSM500-AC and 1*PSM900-AC) 1440W (with 2*PSM900-AC) For S6500-24MPP4Y: 751W (with 1*PSM900-AC, by default) 378W (with 1*PSM500-AC) 802W (with 2*PSM500-AC) 1168W (with 1*PSM500-AC and 1*PSM900-AC) 1534W (with 2*PSM900-AC) For S6500-48MPP6Y: 701W (with 1*PSM900-AC, by default) 328W (with 1*PSM500-AC) 752W (with 2*PSM500-AC) 1118W (with 1*PSM500-AC and 1*PSM900-AC) 1484W (with 2*PSM900-AC)
Tymheredd a Uchder Gweithredu
For S6500-24G4XF/S6500-48G6XF/S6500-24M4Y/S6500-48M6Y: -5 °C to 50 °C (23 °F to 122 °F) @ 300 meters -5 °C to 45 °C (23 °F to 113 °F) @ 2,000 meters -5 °C to 40 °C (23 °F to 104 °F) @ 3,000 meters For S6500-24GP4XF/S6500-48GP6XF/S6500-24MPP4Y/S6500-48MPP6Y: -5 °C to 45 °C (23 °F to 113 °F) @ 2,000 meters -5 °C to 40 °C (23 °F to 104 °F) @ 3,000 meters
Tymheredd Storio -40 ° C i 70 ° C (-40 ° F i 158 °F)
Lleithder Gweithredol 10% i 90% RH Heb gyddwyso
Lleithder Storio
5% i 90% RH Heb gyddwyso
34 Atodiad B Manylebau
Omada Campus Stackable L3 Managed Switch
Specifications for S7500 Series Switches
Eitem
Cynnwys
Safonau
IEEE 802.3, IEEE 802.3x IEEE 802.3z, IEEE 802.3ae (For S7500-26XF6Y, S7500-48XF4C, S7500-24Y4C, S7500-48Y8C IEEE 802.3by, IEEE 802.3cc (For S7500-26XF6Y, S7500-24Y4C, S7500-48Y8C) IEEE 802.3 ba, IEEE 802.3bm (For S7500-48XF4C , S7500-24Y4C, S7500-48Y8C, S7500-32C)
1000BASE-SX/LX/LX10/BX10: MMF, SMF 10GBASE-SR/LR: MMF, SMF 10G SFP+ Direct Attach Cable (SM5220-1M, SM5220-3M) 25GBASE-SR/LR: MMF, SMF (SM6110-SR, SM6110-LR) 25G SFP28 Direct Attach Cable (SM6220-1M) 40GBASE-SR4/LR4: MMF, SMF (For S7500-48XF4C, S7500-24Y4C, Transmission Medium S7500-48Y8C, S7500-32C) 40G QSFP+ Direct Attach Cable (For S7500-48XF4C, S7500-24Y4C, S7500-48Y8C, S7500-32C) 100GBASE-SR4/LR4: MMF, SMF (SM9110-SR4 for S7500-48XF4C, S7500-24Y4C, S7500-48Y8C, S7500-32C) 100G QSFP28 Direct Attach Cable (SM9220-1M for S7500-48XF4C, S7500-24Y4C, S7500-48Y8C, S7500-32C)
LED
Tymheredd a Uchder Gweithredu
S7500-26XF6Y: PWR1, PWR2, SYS, FAN, MGMT, MST, SPD, STK, SFP+, SFP28 S7500-48XF4C: PWR1, PWR2, SYS, FAN, MGMT, MST, SPEED, STK, SFP+, QSFP28 S7500-24Y4C: PWR1, PWR2, SYS, FAN, MGMT, MST, SPD, STK, SFP28, QSFP28 S7500-48Y8C: PWR1, PWR2, SYS, FAN, MGMT, MST, SPEED, STK, SFP28, QSFP28 S7500-32C: PWR1, PWR2, SYS, MGMT, FAN, MST, SPEED, STK, QSFP28 -5 °C to 45 °C (23 °F to 113 °F) @ 300 meters -5 °C to 40 °C (23 °F to 104 °F) @ 2,000 meters -5 °C to 35 °C (23 °F to 95 °F) @ 3,000 meters
Tymheredd Storio -40 ° C i 70 ° C (-40 ° F i 158 °F)
Lleithder Gweithredol 10% i 90% RH Heb gyddwyso
Lleithder Storio
5% i 90% RH Heb gyddwyso
For S7500-26XF6Y, S7500-48XF4C, and S7500-24Y4C, the maximum operating temperature supported can reach 50 °C (122 °F) @ 300 meters, 45 °C (113 °F) @ 2,000 meters, and 40 °C (104 °F) @ 3,000 meters.
Yr uchder a gefnogir yw lefel y môr i 5000 m. Dylid nodi pan fydd yr uchder uwchlaw 2000 m, am bob 220 metr o gynnydd mewn uchder, bydd y tymheredd gweithredu uchaf yn gostwng 1°C (1.8°F).
Atodiad B Manylebau 35
Omada Campus Stackable L3 Managed Switch
Manylebau ar gyfer Modiwlau Cyflenwad Pŵer
PSM500-AC
(For S6500-24GP4XF/ S6500-48GP6XF/ S6500-24MPP4Y/ S6500-48MPP6Y)
PSM900-AC
(For S6500-24GP4XF/ S6500-48GP6XF/ S6500-24MPP4Y/ S6500-48MPP6Y)
PSM550-AC
(For S6500-24M4Y/ S6500-48M6Y/ S7500-26XF6Y/ S7500-48XF4C/ S7500-24Y4C/ S7500-48Y8C/ S7500-32C)
Mewnbwn Pwer
100 V240 V~ 50/60 Hz 8A
100-120V (included)~ 50/60Hz 12A (for locations using low voltage, see specifications for specific countries/ regions)
120 (not included)240V~ 50/60Hz 10A (for other locations)
100 V240 V~ 50/60 Hz 7A
Allbwn Voltage
Primary: 53.5 VDC Standby: 12 VDC
Primary: 53.5 VDC Standby: 12 VDC
Primary: 12 VDC Standby: 12 VDC
Allbwn Cyfredol
9.35 A (Uchafswm)
16.5 A (Uchafswm)
45 A (Uchafswm)
Pŵer Allbwn
500 W (Uchafswm)
900 W (Uchafswm)
550 W (Uchafswm)
Uchder Gweithredu
For PSM500-AC/PSM900-AC: Sea level to 3000 m For PSM550-AC: Sea level to 5000 m
36 Atodiad B Manylebau
Rhybudd Marc CE
Mae hwn yn gynnyrch dosbarth A. Mewn amgylchedd domestig, gall y cynnyrch hwn achosi ymyrraeth radio, ac os felly efallai y bydd yn ofynnol i'r defnyddiwr gymryd mesurau digonol.
Datganiad Cydymffurfiaeth yr UE
Mae TP-Link drwy hyn yn datgan bod y switsh yn cydymffurfio â gofynion hanfodol a darpariaethau perthnasol eraill cyfarwyddebau 2014/30/EU, 2014/35/EU, 2011/65/EU a (EU)2015/863. Gellir dod o hyd i Ddatganiad Cydymffurfiaeth gwreiddiol yr UE yn https://www.tp-link.com/en/support/ce/
Datganiad Cydymffurfiaeth y DU
Mae TP-Link drwy hyn yn datgan bod y switsh yn cydymffurfio â gofynion hanfodol a darpariaethau perthnasol eraill Rheoliadau Cydnawsedd Electromagnetig 2016 a Rheoliadau Offer Trydanol (Diogelwch) 2016. Gellir dod o hyd i Ddatganiad Cydymffurfiaeth gwreiddiol y DU yn https://www.tp-link.com/support/ukca/
, .
RHYBUDD:
Polyn dwbl, asio niwtral. Datgysylltwch y prif gyflenwad cyn gwasanaethu.
Gwybodaeth Diogelwch
· Cadwch y ddyfais i ffwrdd o ddŵr, tân, lleithder neu amgylcheddau poeth. · Peidiwch â cheisio dadosod, atgyweirio neu addasu'r ddyfais. Os oes angen gwasanaeth arnoch, cysylltwch â ni. · Gosodwch y ddyfais gyda'i harwyneb gwaelod i lawr. · Mae'r plwg ar y llinyn cyflenwad pŵer yn cael ei ddefnyddio fel y ddyfais datgysylltu, rhaid i'r allfa soced fod
yn hawdd ei gyrraedd. · Plygiwch y cynnyrch i mewn i'r socedi wal gyda chysylltiad daearu trwy'r llinyn cyflenwad pŵer
or plug. · The socket-outlet shall be installed near the equipment and shall be easily accessible. · The PoE ports shall not be used to charge lithium batteries or devices supplied by lithium
batris.
· Operating temperature: For S6500-24G4XF/S6500-48G6XF/S6500-24M4Y/S6500-48M6Y/S7500-26XF6Y/ S7500-48XF4C/S7500-24Y4C: -5 °C to 50 °C (23 °F to 122 °F) @ 300 meters -5 °C to 45 °C (23 °F to 113 °F) @ 2,000 meters -5 °C to 40 °C (23 °F to 104 °F) @ 3,000 meters For S6500-24GP4XF/S6500-48GP6XF/S6500-24MPP4Y/S6500-48MPP6Y: -5 °C to 45 °C (23 °F to 113 °F) @ 2,000 meters -5 °C to 40 °C (23 °F to 104 °F) @ 3,000 meters S7500-48Y8C/S7500-32C: -5 °C to 45 °C (23 °F to 113 °F) @ 300 meters -5 °C to 40 °C (23 °F to 104 °F) @ 2,000 meters -5 °C to 35 °C (23 °F to 95 °F) @ 3,000 meters
· : S6500-24G4XF/S6500-48G6XF/S6500-24M4Y/S6500-48M6Y/S7500-26XF6Y/S7500-48XF4C/ S7500-24Y4C -5°C 50°C23°F 122°F@ 300 -5°C 45°C23°F 113°F@ 2,000 -5°C 40°C23°F 104°F@ 3,000 S6500-24GP4XF/S6500-48GP6XF/S6500-24MPP4Y/S6500-48MPP6Y -5°C 45°C23°F 113°F@ 2,000 -5°C 40°C23°F 104°F@ 3,000 S7500-48Y8C/S7500-32C -5°C 45°C23°F 113°F@ 300 -5°C 40°C23°F 104°F@ 2,000 -5°C 35°C23°F 95°F@ 3,000
This equipment is not suitable for use in locations
where children are likely to be present.
Darllenwch a dilynwch y wybodaeth ddiogelwch uchod wrth weithredu'r ddyfais. Ni allwn warantu na fydd unrhyw ddamweiniau neu ddifrod yn digwydd oherwydd defnydd amhriodol o'r ddyfais. Defnyddiwch y cynnyrch hwn yn ofalus a gweithredwch ar eich menter eich hun.
Am gymorth technegol, canllawiau defnyddwyr a gwybodaeth arall, ewch i https://support.omadanetworks.com/, neu sganiwch y cod QR.
© 2026 TP-Link 7100002759 REV2.0.1
Dogfennau / Adnoddau
![]() | L3Campus Stackable Managed Switch |
Cyfeiriadau
- omada.tplinkcloud.comomada.tplinkcloud.com
- Cymorth Rhwydwaith Omadacefnogaeth.omadanetworks.com
- Dogfennau | Cymorth Rhwydwaith Omadacefnogaeth.omadanetworks.com
- support.omadanetworks.com/product/cefnogaeth.omadanetworks.com
- mellt_protection_guidecefnogaeth.omadanetworks.com
- Omada - Networks Empower Business | TP-Linkwww.omadanetworks.com
- Cydymffurfiaeth Rheoleiddio CE | TP-Cyswlltwww.tp-link.com
- Cydymffurfiad Rheoleiddio | TP-Linkwww.tp-link.com
- Llawlyfr Defnyddiwrmanual.tools