- To drain the oil, twist off the screw pointed at the oil draining port. After the oil is drained re-tighten the screw.
- To fill the pump with oil, unscrew the lid pointed at the filling port. Fill the pump until the oil level reaches the mark that is on the pump.
NODYN: The oil needed is deep vacuum pump oil (viscosity (cSt) @ 40°C is 46 +/-10%.) - To reset the vacuum pump timer, follow the steps on the pictures below.